Our Pickleball Build Process
Construction is more than surfacing. Our team engineers court systems from the ground up so they play right and stay right.
Pickleball-specific considerations:
Court orientation • Sun glare control • Noise mitigation • Tournament sizing
STEP O1
Evaluation
Evaluate site conditions, drainage, and layout requirements.
STEP 02
Basework &
Drainage
Prepare subgrade, install base materials, and ensure proper slope.
STEP 03
Concrete / Asphalt
Install structural slab or asphalt surface.
STEP 04
Surfacing
Apply coatings and surface systems.
STEP 05
Striping & Equipment
Install line striping and court equipment.
STEP 06
Final Inspection
Final walkthrough and readiness for play.