Surface System
SportMaster Standard Acrylic System
Project Type
Seven-Court Installation
Project Summary
This project involved the full interior buildout of a seven-court pickleball facility for Lakeland Pickleball Academy in Lakeland, Florida. The space was transformed from a raw warehouse into a high-performance indoor venue with a clean, professional aesthetic. The completed facility supports both training and competitive play in a controlled indoor environment.
Scope & Execution
The project began with site evaluation to determine optimal court orientation and drainage strategy. Our team completed grading, base preparation, and concrete installation to meet precise tolerances, followed by premium surfacing and finishing systems.
Construction Considerations
Shot blasting process to ensure proper surface preparation and coating adhesion
Three-color court design to enhance visibility and differentiate play zones
In-ground net systems for a clean, permanent indoor installation
Multi-court layout optimized for training and high-volume play
Unique Challenges
Repurposing an industrial warehouse into a sports-specific facility
Addressing existing slab conditions including joints and surface inconsistencies
Maintaining level tolerances across a large indoor footprint
Project Context
Industrial Space to Indoor Training Facility
A private residential installation designed to integrate with the surrounding property while delivering a high-performance playing surface.